The recent launch of the hydroelectric power station Zarchob-2 was held at the Sariasiyo district of Surkhandarya province in Uzbekistan.
Se ha realizado recientemente la puesta en marcha de la Central Hidroeléctrica Zarchob-2 que tiene lugar en el distrito de Sariasiyo de la provincia de Surkhandarya en Uzbekistán.
The Zarchob Hydropower Project includes the design, equipment supply, supervision of installation and commissioning for all the electromechanical systems under Zarchob-1 and Zarchob-2, as well as the Zarchob 220kV/110kV/10kV substation. The Zarchob-1 hydropower plant and substation have been operating since April this year.